March 5, 2014 ccyachts

C&C 30 & Redline 41 Progress Update

Progress Report: C&C One Design 30 In February, we broke the C&C 30 mold free from the plug, and now the build process finally begins!  The first hull has been gelcoated in the mold, glass has been laid down, then a layer of reinforcing laminate is being fitted to the hull, and now a variable density core cell layer. The deck is well along, too.

Watch for our updates on the C&C Facebook Page, and check out the C&C 30 Album to follow along.

Progress Report: Redline 41 

We are moving right along, so we can get this Redline 41 moving towards Bermuda!  She is looking great. Thus far, the hull has been infused and demolded. She is currently being fitted for the interior liners, and the main bulkhead has been installed.

Naturally, we are keeping tabs on this one, too.  Watch the rendering come to fruition on our C&C Facebook page in the Redline 41 Album.

Tagged: ,

Leave a Reply

Your email address will not be published. Required fields are marked *

Inquire Now